Projects (all current and future lines whose nickname starts with the project)
Individual service lines
Add service line — type to search
Contract lots
Omada doesn't know the lots, so they come from the DepEd allocation lists (one Excel file per lot).
Each site is matched by the BEIS school ID in its Omada name; failing that by a replaced school ID or the school name,
and a school missing from the lists takes its region's lot. Pick a lot in the SLA report to report on it.
The lot comes from the sheet or file name ("Lot 1"). Importing a lot replaces its previous list.
SLA exclusions
Periods that don't count toward the SLA: holidays, school closures, government shutdowns,
scheduled power-offs, power failures. Excluded time counts neither as measured time nor as downtime, and it
pauses the 72-hour restoration clock. Every report lists the exclusions it used.
Assign Omada
Whole projects (all current and future organizations)
Whole organizations (all current and future sites)